Assessment of Probability Reliability of Hydro technical Structures during Operation Period

Authors

  • Narziev J. J. Scientific Research Institute of Irrigation and Water Problems Ministry of Water Resources of the Republic of Uzbekistan
  • Maxmudov I. E. Scientific Research Institute of Irrigation and Water Problems Ministry of Water Resources of the Republic of Uzbekistan
  • Paluanov D. T. Scientific Research Institute of Irrigation and Water Problems Ministry of Water Resources of the Republic of Uzbekistan
  • Ernazarov A. I. Scientific Research Institute of Irrigation and Water Problems Ministry of Water Resources of the Republic of Uzbekistan

Keywords:

of hydro technical structures, operation, reliability, danger, accident, dam

Abstract

In this article, measures have been developed and recommended for organizing the reliable operation of hydro technical structures during their operation.

Downloads

Published

2022-01-26

How to Cite

J. J., N., I. E., M. ., D. T., P. ., & A. I., E. . (2022). Assessment of Probability Reliability of Hydro technical Structures during Operation Period. International Journal of Innovative Analyses and Emerging Technology, 2(1), 59–62. Retrieved from https://oajournals.net/index.php/ijiaet/article/view/949

Issue

Section

Articles

Similar Articles

1 2 3 4 5 6 7 > >> 

You may also start an advanced similarity search for this article.